Integrity is an essential part of our culture. Eric Gowin, president, says, “We approach our projects as partnerships with our clients and fellow professionals. We do a maximum price and then protect them. We work closely with them to make sure we bring the project in on time and within budget. We head up the design, employ the architect and carefully work through the design issues. By committing to a true partnership, we look out for everyone’s best interest.”

Ed Lampitt, vice president of Colliers Turley Martin Tucker, says, “Eric Gowin’s honesty, integrity and creative construction approach brings value to each project. You know what you’re getting with Eric Gowin, and that’s why we work with him.”

Everyone’s best interest – you deserve that kind of integrity, service and success. 

Contegra Graduates with Honors from Sanford-Brown

 At Contegra, we always try to meet the needs of our clients. As a design/build contractor for Sanford-Brown College’s recently completed new headquarters in Fenton, Mo., we successfully performed turn-key site preparation and construction services. Sanford Brown College offers short-term, degree and non-degree programs in allied health, business and information technology. The new facility can accommodate up to 2,000 students.

However, after the project was completely designed and under construction, Sanford-Brown asked for an in-house working ambulance so students could attend injured victims in a simulated moving vehicle and become better prepared when they started working in their field. We modified our work schedule on the construction of the front curtain wall of green-tinted glass and its framing, and when the timing was right, we installed the ambulance then the front wall.

Sanford-Brown College Headquarters Criteria

  • Schedule: May 2005 to December 2005
  • Building: Two-story 55, 000 square feet 
  • 23 classrooms, nine lecture classrooms, six computer labs, nine wet labs including an emergency medical services lab complete with an ambulance
  • Site improvements included: 25,000 cubic yards of excavating and underground piped storm water detention system
  • Parking for 440 vehicles

Contegra Keeps Up With Demand at Gateway Commerce Center

 CLICK TO ENLARGE >>Gateway Commerce Center in Edwardsville, Ill., has become a distribution hub for bulk warehouse tenants in the Midwest, and at Contegra, we’re helping to expand it. Our association with the center’s manager and developer Trammell Crow Company/CB Richard Ellis ensures that all our construction projects run smoothly, with on-time completions and few surprises.

 Currently, we’re the general contractor for the Westway III 570,000 square foot building expansion accommodating 1.1 million square foot contiguous building area for Proctor & Gamble along with the associated tenant interior and exterior improvements totally $20 million.

Recently completed within the Center is the original Westway I and III shell buildings constructed concurrently totaling 1.14 million square feet, Turner Electric 60,000 square feet manufacturing facility, Schneider National’s 30,000 square feet regional operations, JB Management’s 156,000 square feel new distribution center now having Crescent Electric and National Sales as tenants.

 

Facts to Grow: Gateway Commerce Center

  • Manager and developer: Trammell Crow Company/CB Richard Ellis
  • Developed area: 13 buildings, totaling over 10 million square feet
  • Total Area:  2,300 Acres
  • Location: Interstates 255 and 270, Edwardsville, Ill.
  • Largest tenants: Unilever, Hershey Foods, Dial Corp., Procter & Gamble, Ozburn Hessey

ITT Technical Institute

 Contegra Construction Co. completed the 32,294-square-foot campus for ITT Technical Insitute at 3640 Corporate Trail Drive near the intersection of Interstates 270 and 70 in Earth City, Mo.

The one-story building hosts a new 80-computer lab as well as state-of-the-art classrooms, labs, offices and lounges for students and teachers. Approximately 775 students are currently enrolled there.

Contegra provided complete turn-key site preparation and construction services on the $3.4 million project. To deliver the building before the lease expired on ITT Tech’s existing facility, Contegra kept to an aggressive eight-month schedule and sequenced trades efficiently. The structure, designed by Gray Design Group, features a brick exterior with extensive storefront glass. The entrance is marked by two decorative canopies.

ITT Technical Institutes are operated by ITT Educational Services Inc. (NYSE: ESI), which provides technology-oriented, post-secondary degree programs. The company operates 87 institutes in 33 states including a second local campus in Arnold, Mo.

Schneider National

 Contegra Construction Co. completed the $4.5 million, 25,000-square-foot truck operating center for owner Schneider National, Inc. at Gateway Commerce Center in Edwardsville, IL. The center, which will eventually bring 400 new jobs to the area, is located on a 26-acre tract acquired by the trucking company from TRiSTAR Business Communities.

The building at 141 Enterprise Drive features 8,500 square feet of office space, 25-foot-high walls, its own fuel canopy with dispensers and parking for 246 trailers.   The facility is expandable.  

Based in Green Bay, Wis., privately-held Schneider National is the largest truckload freight carrier in North America, with 36 locations in the U.S., Canada and Mexico.  Founded in 1935, the company operates more than 14,000 tractors, 40,000 trailers and has partnerships with more than 6,000 carriers.

Westway I & III

Trammell Crow Company and Multi-Employer Property Trust contracted with Contegra Construction Company to build two speculative buildings concurrently to save general conditions cost and increase buying efficiencies.

Westway I 479,000 square feet and Westway III 579,000 square feet respectively were set up for seven maximum tenants and accommodates 191 loading docks.
 

See additional projects under the News area of our website.